You don't have javascript enabled. Good luck with that.
Pencarian
DKI akan Percepat Pembebasan Lahan untuk MRT

City to Speed Up Land Buying Process for MRT

Jakarta Provincial Government is about to speed up the land buying process for Mass Rapid Transit (MRT) project. Strict action will be applied since the project is for public facility.

Construction remains running. Citizens should not disturb the public urgency

“Construction remains running. Citizens should not disturb the public urgency. I’ll check the real condition later,” said Acting Jakarta Governor, Sumarsono, Tuesday (11/15).

He added that the land owners should cooperative for this case. The land will be used as public transportation. If the construction is disturbed, citizens will wait longer to get this transportation.

Traffic Engineering Applied for Jalan Pasar Jumat

“There are five lands to be bought. I want the buying process remains run as usual,” he added.

As planned before, he will visit the MRT site project this noon, especially for delayed land buying process.

“I need to visit the site for looking the solution. I also have role for this project, together with MRT Director,” he closed.

Linked News
Popular News indeks
  1. Transjakarta Brings Lunar New Year Festivities to Public Transport

    access_time16-02-2026 remove_red_eye974 personAldi Geri Lumban Tobing
  2. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye934 personAldi Geri Lumban Tobing
  3. Jakarta Govt-City Council Step Up Coordination to Address Key Urban Challenges

    access_time22-02-2026 remove_red_eye837 personFakhrizal Fakhri
  4. Public Works Agency Gets Transjakarta Corridor 13 Back in Tip-Top Shape

    access_time17-02-2026 remove_red_eye710 personAldi Geri Lumban Tobing
  5. Chinese New Year Holiday, Ancol Flocked by Visitors

    access_time16-02-2026 remove_red_eye608 personAnita Karyati